GATE 2020 Architecture and Planning question: In a residential complex, the central play area is to be converted as a detention pond…

In a residential complex, the central play area is to be converted as a detention pond for storm water management. For a 24 hour rainfall event of 100 mm, 100% storm water of central play area and 70% storm water run-off from rest of the complex is to be held at the detention pond. Area distribution in the residential complex is given in the table.

Type Area (m) Run-off coefficient
Apartment Blocks 1250 0.80
Central Play Area 150 0.60
Other Permeable Areas 200 0.70
Other Impermeable Areas 400 0.90

The required depth of the detention pond (in mm) is ______

Show answer

Official answer: 760