GATE 2020 Architecture and Planning question: Plan and section of an isolated foundation is given below. The volume of concrete up to…

Plan and section of an isolated foundation is given below. The volume of concrete up to Ground Level (GL) (in m, rounded off to two decimal places) is ______

figure

Show answer

Official answer: 3.1 to 3.4