GATE 2020 set2 · ME · MCQ · 1 mark · Industrial Engineering › Production Planning & Scheduling

GATE 2020 set2 Mechanical Engineering question: In Materials Requirement Planning, if the inventory holding cost is very high and the…

In Materials Requirement Planning, if the inventory holding cost is very high and the setup cost is zero, which one of the following lot sizing approaches should be used?

  1. (A)

    Economic Order Quantity

  2. (B)

    Lot-for-Lot

  3. (C)

    Base Stock Level

  4. (D)

    Fixed Period Quantity, for 2 periods

Show answer

Official answer: B