GATE Assistant

Past questions › Mechanical Engineering › GATE 2020 set2

GATE 2020 set2 · ME · NAT · 2 marks · Manufacturing Engineering › Computer Integrated Manufacturing & NC/CNC

GATE 2020 set2 Mechanical Engineering question: A point ‘P’ on a CNC controlled XY- stage is moved to another point ‘Q’ using the…

A point ‘P’ on a CNC controlled XY- stage is moved to another point ‘Q’ using the coordinate system shown in the figure below and rapid positioning command (G00).

figure

A pair of stepping motors with maximum speed of 800 rpm, controlling both the X and Y motion of the stage, are directly coupled to a pair of lead screws, each with a uniform pitch of 0.5 mm. The time needed to position the point ‘P’ to the point ‘Q’ is __________ minutes (round off to 2 decimal places).

Show answer

Official answer: 1.4 to 1.6

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion