GATE Assistant

Past questions › Mining Engineering › GATE 2020

GATE 2020 · MN · NAT · 2 marks · Mining Geology, Mine Development and Surveying › Levelling, Tacheometry & Triangulation

GATE 2020 Mining Engineering question: A tacheometer was setup at station P and the following readings were taken at two…

A tacheometer was setup at station P and the following readings were taken at two stations A and B with the staff held vertical and the line of sight horizontal.

Line Bearing Staff intercept
PA 210° 1.2 m
PB 135° 1.4 m

The additive and multiplying constants of the tacheometer are 0 and 100, respectively. The length of AB in m is _____ (round off to 1 decimal place).

Show answer

Official answer: 157 to 161

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion