GATE 2020 Petroleum Engineering question: A build up test was performed on a well after 1000 hours of oil production. During the…
A build up test was performed on a well after 1000 hours of oil production. During the shut-in period, the Horner’s approximation is valid which results in the following equation relating the shut-in well pressure () to the shut-in time:
Here, is the reservoir permeability, is the reservoir thickness, is the initial reservoir pressure, is the flow rate during production, is the oil viscosity, is the dimensionless production time, is the dimensionless pressure at , is a constant, and is dependent on the shut-in time and the production time.
The value of after 5 hours of shut-in (rounded off to one decimal place) is ________.
Show answer
Official answer: 200.5 to 201.5