GATE Assistant

Past questions › Petroleum Engineering › GATE 2020

GATE 2020 · PE · NAT · 2 marks · Oil and Gas Well Drilling Technology › Directional, Horizontal & Multilateral Drilling

GATE 2020 Petroleum Engineering question: It is desired to drill a deviated well with ‘build and hold type’ trajectory. The…

It is desired to drill a deviated well with ‘build and hold type’ trajectory. The kick-off point is at a vertical depth of 1500 ft from the surface and the rate of build is 2°/100 ft. At a true vertical depth (TVD) of 7500 ft, the net horizontal departure to the target is 2500 ft. The total measured depth is ______ ft.

Show answer

Official answer: 8000 to 8050

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion