GATE 2020 Petroleum Engineering question: It is desired to drill a deviated well with ‘build and hold type’ trajectory. The…
It is desired to drill a deviated well with ‘build and hold type’ trajectory. The kick-off point is at a vertical depth of 1500 ft from the surface and the rate of build is 2°/100 ft. At a true vertical depth (TVD) of 7500 ft, the net horizontal departure to the target is 2500 ft. The total measured depth is ______ ft.
Show answer
Official answer: 8000 to 8050