GATE 2020 Production and Industrial Engineering question: A rectifying inspection is performed on a lot of size N= 1000 using a Single-Sampling…
A rectifying inspection is performed on a lot of size = 1000 using a Single-Sampling Plan with the sample size = 60 and the acceptance number = 1. If the Acceptable Quality Level is 1.0%, the producer’s risk associated with the sampling plan (rounded off to the nearest integer) in % is
Show answer
Official answer: A