GATE 2021 set2 Civil Engineering question: The stopping sight distance (SSD) for a level highway is 140 m for the design speed of…

The stopping sight distance (SSD) for a level highway is 140 m for the design speed of 90 km/h. The acceleration due to gravity and deceleration rate are 9.81 m/s and 3.5 m/s, respectively. The perception/reaction time (in s, round off to two decimal places) used in the SSD calculation is ________

Show answer

Official answer: 1.9 to 2.1