GATE 2021 set2 · CS · MSQ · 1 mark · Operating System › CPU Scheduling
GATE 2021 set2 Computer Science and Information Technology question: Which of the following statement(s) is/are correct in the context of CPU scheduling?
Which of the following statement(s) is/are correct in the context of CPU scheduling?
- (A)
Turnaround time includes waiting time.
- (B)
The goal is to only maximize CPU utilization and minimize throughput.
- (C)
Round-robin policy can be used even when the CPU time required by each of the processes is not known apriori.
- (D)
Implementing preemptive scheduling needs hardware support.
Show answer
Official answer: A,C,D