GATE 2021 Environmental Science and Engineering question: A facultative pond system for sewage treatment consists of two ponds in series. The…

A facultative pond system for sewage treatment consists of two ponds in series. The hydraulic retention time (HRT) of each pond is 6 days. The total BOD reduction through the entire pond system is 90 %. If the ponds are considered to be completely mixed, then the rate constant describing the BOD removal is ____________ day (rounded off to two decimal points). Assume that the rate constant is same for both the ponds.

Show answer

This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.

Practise this question with exam-style marking