GATE Assistant

Past questions › Mining Engineering › GATE 2021

GATE 2021 · MN · MCQ · 2 marks · Mining Geology, Mine Development and Surveying › Underground Surveying & Curves

GATE 2021 Mining Engineering question: The pit bottom in a correlation survey is shown in the figure. Points C and D represent…

The pit bottom in a correlation survey is shown in the figure. Points C and D represent two suspended wires. The bearing of line CD is 286°00′00″ and its length is 4.64 m. The angle CED is measured as 00°00′40″. The length of line DE is 5.46 m. Considering the Weisbach triangle method, the bearing of the line CE is

figure

  1. (A)

    286°00'47"

  2. (B)

    285°59'12.9"

  3. (C)

    286°00'40"

  4. (D)

    285°00'47.1"

Show answer

This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.

Practise this question with exam-style marking