GATE Assistant

Past questions › Petroleum Engineering › GATE 2021

GATE 2021 · PE · MCQ · 2 marks · Petroleum Production Operations › Well Stimulation & Artificial Lift

GATE 2021 Petroleum Engineering question: Match the suitable artificial lift methods (GROUP I) to meet the requirements (GROUP II)…

Match the suitable artificial lift methods (GROUP I) to meet the requirements (GROUP II) given in the table.

GROUP I GROUP II
(P) Progressive cavity pump (I) To deliver high-water cut (95%) oil with high flow rate.
(Q) Electric submersible pump (II) To deliver a fluid with viscosity of 1000 cP.
(R) Sucker rod pump (III) To deliquify a gas-well with 5 bbl/day water.
(S) Gas lift (IV) To be used in a sandy oil well to produce 5000 bbl/day.
  1. (A)

    P – I, Q – II, R – IV, S – III

  2. (B)

    P – II, Q – I, R – IV, S – III

  3. (C)

    P – I, Q – II, R – III, S – IV

  4. (D)

    P – II, Q – I, R – III, S – IV

Show answer

Official answer: D

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion