GATE Assistant

Past questions › Civil Engineering › GATE 2022 set1

GATE 2022 set1 · CE · NAT · 2 marks · Geotechnical Engineering › Consolidation & Compaction

GATE 2022 set1 Civil Engineering question: A raft foundation of 30 m × 25 m is proposed to be constructed at a depth of 8 m in a…

A raft foundation of 30 m × 25 m is proposed to be constructed at a depth of 8 m in a sand layer. A 25 m thick saturated clay layer exists 2 m below the base of the raft foundation. Below the clay layer, a dense sand layer exists at the site. A 25 mm thick undisturbed sample was collected from the mid-depth of the clay layer and tested in a laboratory oedometer under double drainage condition. It was found that the soil sample had undergone 50 % consolidation settlement in 10 minutes.

The time (in days) required for 25 % consolidation settlement of the raft foundation will be ____________. (round off to the nearest integer)

Show answer

Official answer: 1730 to 1740

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion