GATE Assistant

Past questions › Mining Engineering › GATE 2022

GATE 2022 · MN · MCQ · 2 marks · Mining Geology, Mine Development and Surveying › Explosives & Blast Design

GATE 2022 Mining Engineering question: Match the drilling pattern with mining operation

Match the drilling pattern with mining operation

figure

  1. (A)

    P→II, Q→III, R→I, S→II

  2. (B)

    P→III, Q→IV, R→I, S→II

  3. (C)

    P→II, Q→I, R→IV, S→III

  4. (D)

    P→III, Q→IV, R→II, S→I

Show answer

Official answer: D

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion