GATE 2022 Petroleum Engineering question: A reservoir is producing oil at 7000 stb/day with a producing gas to oil ratio (GOR) of…
A reservoir is producing oil at 7000 stb/day with a producing gas to oil ratio (GOR) of 2000 scf/stb. At a certain point of time, the reservoir pressure is monitored and decided to be maintained at a constant pressure of 2500 psi using water injection. The PVT properties estimated at 2500 psi are:
- Bubble point pressure = 3000 psi
- Oil formation volume factor = 1.2 rb/stb
- Water formation volume factor = 1.0 rb/stb
- Gas formation volume factor = 0.0012 rb/scf
- Solution GOR = 300 scf/stb
The initial water injection rate (stb/day) required to maintain oil production at 7000 stb/day is ____________ (rounded off to the nearest integer).
Show answer
Official answer: 22675 to 22685