GATE 2023 set2 Civil Engineering question: The cross-section of a small river is sub-divided into seven segments of width 1.5 m…
The cross-section of a small river is sub-divided into seven segments of width 1.5 m each. The average depth, and velocity at different depths were measured during a field campaign at the middle of each segment width. The discharge computed by the velocity area method for the given data is ______ m/s (round off to one decimal place).
| Segment | Average depth (D) (m) | Velocity (m/s) at 0.2D | Velocity (m/s) at 0.6D | Velocity (m/s) at 0.8D |
|---|---|---|---|---|
| 1 | 0.40 | -- | 0.40 | -- |
| 2 | 0.70 | 0.76 | -- | 0.70 |
| 3 | 1.20 | 1.19 | -- | 1.13 |
| 4 | 1.40 | 1.25 | -- | 1.10 |
| 5 | 1.10 | 1.13 | -- | 1.09 |
| 6 | 0.80 | 0.69 | -- | 0.65 |
| 7 | 0.45 | -- | 0.42 | -- |
Show answer
Official answer: 8.4 to 8.6