GATE Assistant

Past questions › Instrumentation Engineering › GATE 2023

GATE 2023 · IN · NAT · 2 marks · Electrical Circuits & Machines › Transformers

GATE 2023 Instrumentation Engineering question: A short-circuit test is conducted on a single-phase transformer by shorting its…

A short-circuit test is conducted on a single-phase transformer by shorting its secondary. The frequency of input voltage is 1 kHz. The corresponding wattmeter reading, primary current and primary voltage are 8 W, 2 A and 6 V respectively. Assume that the no-load losses and the no-load currents are negligible, and the core has linear magnetic characteristics. Keeping the secondary shorted, the primary is connected to a 2 V (RMS), 1 kHz sinusoidal source in series with a mF capacitor. The primary current (RMS) will be _____ A (rounded off to two decimal places).

Show answer

Official answer: 0.95 to 1.05

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion