GATE 2023 Mining Engineering question: A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill…
A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill hole is 110 mm. The drilling length is 8.8 m including subgrade of 10%. The bulk explosive density is 900 kg/m.
If the powder factor is 2.5 m/kg, the charge length in m is _____.
[rounded off to 2 decimal places]
Show answer
Official answer: 4.44 to 4.55