GATE Assistant

Past questions › Mining Engineering › GATE 2023

GATE 2023 · MN · NAT · 2 marks · Mining Geology, Mine Development and Surveying › Explosives & Blast Design

GATE 2023 Mining Engineering question: A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill…

A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill hole is 110 mm. The drilling length is 8.8 m including subgrade of 10%. The bulk explosive density is 900 kg/m.

If the powder factor is 2.5 m/kg, the charge length in m is _____.

[rounded off to 2 decimal places]

Show answer

Official answer: 4.44 to 4.55

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion