GATE 2023 Metallurgical Engineering question: Copper ore assaying 10 wt.% Cu is fed to a concentration plant at the rate of 100…
Copper ore assaying 10 wt.% Cu is fed to a concentration plant at the rate of 100 tons/h. If the grades of concentrate and tailing are 30 wt.% Cu and 1 wt.% Cu, respectively, the percentage recovery of copper in concentrate is ____________ (round off to nearest integer).
Given: 1 ton = 1000 kg
Show answer
This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.