GATE 2023 Petroleum Engineering question: A kill mud of appropriate density is required to be injected in a well such that the…

A kill mud of appropriate density is required to be injected in a well such that the shut-in pressure is 6.8 x 10 Pa at a depth of 3500 m. Here, the shut-in pressure is the quantity by which the bottom-hole pressure exceeds the hydrostatic pressure of the original mud at the given depth. The density of the original mud is 1100 kg/m.

The density of the kill mud is _________ kg/m (rounded to two decimal places).