GATE 2023 Production and Industrial Engineering question: An arc welding operation is performed at 25 V and 200 A at welding speed of 2 mm/s. The…
An arc welding operation is performed at 25 V and 200 A at welding speed of 2 mm/s. The heat used for melting is 80 % of the total heat generated. The unit melting energy of the metal to be joined is 10 J/mm. The volume of the weld metal produced per unit time, in mm/s, is _____ (in integer).
Show answer
Official answer: 200