GATE 2024 Architecture and Planning question: Match the items in Group–I with their corresponding items in Group–II. Group–I Group–II…
Match the items in Group–I with their corresponding items in Group–II.
| Group–I | Group–II |
|---|---|
| (P) Floating floor | (1) Overflow control |
| (Q) Float valve | (2) Delay not affecting a project |
| (R) Metal float | (3) Acoustical buffer |
| (S) Free float | (4) Plastering equipment |
| (5) Traffic flow control |
Show answer
Official answer: C