GATE Assistant

Past questions › Civil Engineering › GATE 2024 set1

GATE 2024 set1 · CE · NAT · 1 mark · Water Resources Engineering › Hydrology

GATE 2024 set1 Civil Engineering question: A 30 cm diameter well fully penetrates an unconfined aquifer of saturated thickness 20 m…

A 30 cm diameter well fully penetrates an unconfined aquifer of saturated thickness 20 m with hydraulic conductivity of 10 m/day. Under the steady pumping rate for a long time, the drawdowns in two observation wells located at 10 m and 100 m from the pumping well are 5 m and 1 m, respectively. The corresponding pumping rate (in m/day) from the well is ______________ (rounded off to 2 decimal places).

Show answer

Official answer: 1852 to 1858

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion