GATE 2024 Mining Engineering question: A project network with the sequence of five activities is shown. The crashing costs of…
A project network with the sequence of five activities is shown.

The crashing costs of activities are
| Activity | A | B | C | D | E |
|---|---|---|---|---|---|
| Duration (week) | 5 | 6 | 8 | 3 | 4 |
| Crashing cost per week (lakh INR) | 4.0 | 2.5 | 2.0 | 3.0 | 4.0 |
If the project is crashed by one week, the increase in project cost, in lakh INR, is
Show answer
Official answer: B