GATE 2024 Mining Engineering question: In an open pit mine, the mineral inventory, prices, costs and capacities are given.…
In an open pit mine, the mineral inventory, prices, costs and capacities are given.
Mineral inventory
| Grade interval | Tonnage (in million tonne) |
|---|---|
| 0 < Cu% ≤ 0.3 | 0 |
| 0.3 < Cu% ≤ 0.4 | 5 |
| 0.4 < Cu% ≤ 0.5 | 5 |
| 0.5 < Cu% ≤ 0.6 | 5 |
| 0.6 < Cu% ≤ 0.7 | 5 |
| 0.7 < Cu% ≤ 0.8 | 5 |
| 0.8 < Cu% | 0 |
- Concentrating cost: INR 3,200/tonne of ore milled
- Smelting & refinery cost: INR 10,000/tonne of copper metal
- Selling price: INR 6,50,000/tonne of copper metal
- Overall recovery: 100%
- Maximum production capacity: 5 million tonne/annum
The mine is operating at 5 million tonne in a year. Considering mining capacity being the only constraint, Lanes’ algorithm (based on profit maximization) is used for determining mill cut-off grade. The total amount of copper produced in million tonne, in the life of the pit, is ______. (round off up to 2 decimals)
Show answer
Official answer: 9.5 to 10