In an open pit mine, the mineral inventory, prices, costs and capacities are given.

Mineral inventory

Grade interval Tonnage (in million tonne)
0 < Cu% ≤ 0.3 0
0.3 < Cu% ≤ 0.4 5
0.4 < Cu% ≤ 0.5 5
0.5 < Cu% ≤ 0.6 5
0.6 < Cu% ≤ 0.7 5
0.7 < Cu% ≤ 0.8 5
0.8 < Cu% 0
  • Concentrating cost: INR 3,200/tonne of ore milled
  • Smelting & refinery cost: INR 10,000/tonne of copper metal
  • Selling price: INR 6,50,000/tonne of copper metal
  • Overall recovery: 100%
  • Maximum production capacity: 5 million tonne/annum

The mine is operating at 5 million tonne in a year. Considering mining capacity being the only constraint, Lanes’ algorithm (based on profit maximization) is used for determining mill cut-off grade. The total amount of copper produced in million tonne, in the life of the pit, is ______. (round off up to 2 decimals)

Show answer

Official answer: 9.5 to 10