Five jobs A, B, C, D and E are available at time = 0 for processing at a machine, and their processing times are listed.

Job A B C D E
Processing time (in days) 9 6 4 5 8

If the jobs are processed using the shortest processing time (SPT) rule, the average flow time (in days) is ________ . (Rounded off to 1 decimal place)

Show answer

Official answer: 16.6