GATE 2025 set2 Civil Engineering question: For a partially saturated soil deposit at a construction site, water content (w) is 15%,…

For a partially saturated soil deposit at a construction site, water content () is 15%, degree of saturation () is 67%, void ratio () is 0.6 and specific gravity of solids in the soil () is 2.67. Consider unit weight of water as 9.81 kN/m.

To fully saturate 5 m of this soil, the required weight of water (in kN) will be ______ (round off to the nearest integer).

  1. (A)

    5

  2. (B)

    6

  3. (C)

    7

  4. (D)

    8

Show answer

Official answer: B