GATE 2025 · MN · NAT · 2 marks · Mining Geology, Mine Development and Surveying › Explosives & Blast Design

GATE 2025 Mining Engineering question: In a surface mine, blasting is carried out using electronic detonator and cartridge…

In a surface mine, blasting is carried out using electronic detonator and cartridge emulsion explosive with following details:

Burden = 3.5 m

Spacing = 4.5 m

Bench height = 10.0 m

Subgrade drilling = 1.0 m

Stemming = 4.0 m

Linear charge concentration = 16 kg/m

Cost of one detonator = Rs. 800

Cost of explosive = Rs. 30/kg

The cost of blasting material per cubic meter of blasted rock, in Rs., is _______ (rounded off to 2 decimal places)

Show answer

Official answer: 22 to 30