Match the entries in GROUP I with the entries in GROUP II.

GROUP I GROUP II
(P) Liquid hold-up (I) Water removal
(Q) Liquid carryover (II) Free gas escaping with liquid phase
(R) Gas blowby (III) Free liquid escaping with gas phase
(S) Gas dehydration (IV) Fraction of pipe volume occupied by liquid
  1. (A)

    P – III; Q – IV; R – I; S – II

  2. (B)

    P – IV; Q – III; R – II; S – I

  3. (C)

    P – I; Q – II; R – IV; S – III

  4. (D)

    P – IV; Q – II; R – III; S – I

Show answer

Official answer: B