GATE Assistant

Past questions › Petroleum Engineering › GATE 2025

GATE 2025 · PE · NAT · 1 mark · Oil and Gas Well Drilling Technology › Well Planning, Rigs & Drilling Methods

GATE 2025 Petroleum Engineering question: The hoisting system of a drilling rig contains seven ideal sheaves with hook load of 3.0…

The hoisting system of a drilling rig contains seven ideal sheaves with hook load of kg.

The static derrick load is ________ kg (rounded off to one decimal place).

Show answer

Official answer: 3.9 to 4.1

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion