GATE 2025 Petroleum Engineering question: The hydrostatic pressure gradient in a vertical well drilled in a relaxed depositional…
The hydrostatic pressure gradient in a vertical well drilled in a relaxed depositional basin is 0.452 psi/ft. Assume that the gradient of effective horizontal stress with depth is constant in the drilling zone and has a value of psi/ft. The casing shoe is at 4000 ft depth.
While drilling the bore hole below the casing shoe with 10 ppg mud, the maximum allowed standpipe pressure is ________ psi (rounded off to one decimal place).
(Note: 1 ppg mud is equivalent to 0.052 psi/ft.)
Show answer
Official answer: 122 to 130