GATE Assistant

Past questions › Petroleum Engineering › GATE 2025

GATE 2025 · PE · NAT · 2 marks · Oil and Gas Well Drilling Technology › Directional, Horizontal & Multilateral Drilling

GATE 2025 Petroleum Engineering question: A horizontal well is planned with two radial sections to land the target at an angle of…

A horizontal well is planned with two radial sections to land the target at an angle of 90°. The total vertical depth (TVD) between the surface and the target is 8000 ft. The buildup rate is 6° per 100 ft in the first section and 9° per 100 ft in the second section. The total angle built by the second section is 30°.

The distance of the first kickoff point from the surface is _______ ft (rounded off to one decimal place).

Show answer

This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.

Practise this question with exam-style marking