GATE Assistant

Past questions › Production and Industrial Engineering › GATE 2025

GATE 2025 · PI · NAT · 2 marks · Manufacturing Processes I › Sand Casting & Gating Design

GATE 2025 Production and Industrial Engineering question: The solidification of a casting starts at 10 AM. However, the solidification of the…

The solidification of a casting starts at 10 AM. However, the solidification of the molten metal at the center-line of the mold starts at 10:03 AM and ends at 10:10 AM. The casting is considered solidified completely when the solidification is completed at the center-line of the mold. The center-line feeding resistance (CFR) in percentage is________. (Answer in integer)

Show answer

Official answer: 70

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion