GATE Assistant

Past questions › Engineering Sciences › GATE 2025 TF

GATE 2025 TF · XE · NAT · 2 marks · Textile Engineering and Fibre Science (XE9) › Yarn Manufacture

GATE 2025 TF Engineering Sciences question: A chute feed system feeds a fibre batt of linear density 300 g/m to a card. The waste…

A chute feed system feeds a fibre batt of linear density 300 g/m to a card. The waste extracted by the card is 5% and the total mechanical draft is 100. The linear density (ktex) of card sliver (correct up to 2 decimal places) is _________.

Show answer

Official answer: 2.8 to 2.9

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion