GATE Assistant

Past questions › Civil Engineering › GATE 2026 set2

GATE 2026 set2 · CE · NAT · 1 mark · Transportation Engineering › Transportation Infrastructure

GATE 2026 set2 Civil Engineering question: A downgrade of 1 in 100 meets an upgrade of 1 in 125 on a road. If the rate of change of…

A downgrade of 1 in 100 meets an upgrade of 1 in 125 on a road. If the rate of change of grade is 0.10 % per 30 m, the length (in m) of the vertical curve between the two grades is ______ (rounded off to the nearest integer).

Show answer

Official answer: 540

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion