GATE 2026 set2 · CE · NAT · 2 marks · Geotechnical Engineering › Consolidation & Compaction

GATE 2026 set2 Civil Engineering question: For a clayey soil stratum, the time required for degree of consolidation from 25 % to 50…

For a clayey soil stratum, the time required for degree of consolidation from 25 % to 50 % is 30 days.

The total time (in days) required for 90 % degree of consolidation of the same soil stratum is ______ (rounded off to the nearest integer).

Show answer

Official answer: 170 to 174