GATE Assistant

Past questions › Geomatics Engineering › GATE 2026

GATE 2026 · GE · NAT · 2 marks · Part B1: Surveying and Mapping › Traversing, Triangulation & Trilateration

GATE 2026 Geomatics Engineering question: It is needed to establish the coordinates of a station A. Two stations B and C are…

It is needed to establish the coordinates of a station A. Two stations B and C are available whose coordinates are given in the table.

Length of line CA = 1212.38 m; ∠BCA = 64°.

The Easting of station A is _______ m (Rounded off to two decimal places).

Assume station A lies to the west of the traverse line BC.

Station Easting (m) Northing (m)
B 11054.09 9484.37
C 10827.62 10112.15
Show answer

Official answer: 9980 to 9985

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion