GATE 2026 · MN · MCQ · 2 marks · Mineral Economics, Mine Planning, Systems Engineering › Inventory Models & Queuing Theory

GATE 2026 Mining Engineering question: A shovel needs to be selected from four models of different capacities, S1 to S4, for…

A shovel needs to be selected from four models of different capacities, S1 to S4, for loading of dumpers. The operational data for the shovel-dumper combination are provided. The mean arrival rate of the dumpers at the loading point is 5 per hour and the waiting cost of dumper is ₹ 200 per hour. The inter-arrival time of dumpers and loading time of shovel follows exponential distribution. Ignoring the shovel hiring cost, the shovel type that will have minimum total cost (waiting and operating cost) is

Model Operating cost of shovel (₹ per hour) Mean loading rate of shovel (number of dumpers per hour)
S1 800 8
S2 850 9
S3 920 10
S4 1000 11
  1. (A)

    S1

  2. (B)

    S2

  3. (C)

    S3

  4. (D)

    S4

Show answer

Official answer: B