GATE Assistant

Past questions › Mining Engineering › GATE 2026

GATE 2026 · MN · NAT · 2 marks · Mining Methods and Machinery › Underground Metal Mining & Stoping

GATE 2026 Mining Engineering question: A regular shaped cut and fill stope is shown. Pillars of size 4 m × 4 m are left at an…

A regular shaped cut and fill stope is shown. Pillars of size 4 m × 4 m are left at an interval of 13 m along the length of the stope. If the density of the mined ore is 2.5 tonne m, and slices are extracted to the full stope width, the total tonnage of ore recovered from the 1 slice of the stope is ___________ . (rounded off to one decimal place)

figure

Show answer

Official answer: 15.4 to 15.7

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion