The grade-tonnage distribution for the ultimate pit of a mine is given below.

Cu grade (%) Cumulative million tonnes below the grade
0.1 0
0.4 15.0
0.5 17.0
0.6 18.0
0.7 19.0
0.9 and above 23.0

The mill cut-off grade is 0.5 % Cu. The annual mining capacity (ore + waste) is 4.5 million tonne and milling capacity is 1.0 million tonne. Excavation is planned in such a way that either of the mine or the mill runs at full capacity throughout. The planned life of the mine, in years, is_______.

[round off to one decimal place]

Show answer

This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.

Practise this question with exam-style marking