GATE 2023 · MN · NAT · 2 marks · Geomechanics and Ground Control › Mine Filling & Strata Control

GATE 2023 Mining Engineering question: A mine void of width 20 m, length 50 m and height 30 m is to be filled with mill…

A mine void of width 20 m, length 50 m and height 30 m is to be filled with mill tailings based cemented paste backfill (CPB). The CPB contains tailings:cement:water as 1.0:0.1:0.2 by weight. The specific gravity of tailings and cement are 2.8 and 2.4 respectively. Assuming 20% of the original volume of water is retained in the final backfill, the amount of cement in tonne required so as to fill the void completely is_____.

[rounded off to nearest integer]

Show answer

Official answer: 6800 to 6850