GATE Assistant

Past questions › Mining Engineering › GATE 2024

GATE 2024 · MN · NAT · 1 mark · Mining Geology, Mine Development and Surveying › Explosives & Blast Design

GATE 2024 Mining Engineering question: A rectangular development heading of dimension 3 m × 2.8 m is to be blasted with holes…

A rectangular development heading of dimension 3 m × 2.8 m is to be blasted with holes of 2.4 m in length. If the pull factor is 0.95 and swell factor is 1.20, the volume of blasted rock per round, in m, is______. (round off up to 2 decimals)

Show answer

Official answer: 22.97 to 23

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion