GATE Assistant

Past questions › Mining Engineering › GATE 2024

GATE 2024 · MN · NAT · 2 marks · Mining Methods and Machinery › Underground Coal Mining

GATE 2024 Mining Engineering question: For a continuous miner (CM) panel, the following data are given. Data related to CM -…

For a continuous miner (CM) panel, the following data are given.

Data related to CM

  • Dimension of a working face: 5.0 m (width) x 3.0 m (height)
  • Web depth, m: 0.6
  • Time for one web cut up to full height, min: 9

Data related to shuttle car

  • Bucket capacity of shuttle car, tonne: 10
  • Fill factor: 0.9
  • Number of cars: 2
  • Cycle time of each car including loading, travel and unloading, min: 6

Assume, unit weight of coal is 1.4 tonne/m and its swell factor is 1.2. Consider, 6 working hours per shift.
The non-working time in min, in working hours per shuttle car to dispatch all coal cut by the CM, is ______. (round off up to 2 decimals)

Show answer

Official answer: 150 to 160

Practise this question with exam-style marking

Discussion

No discussion yet.

Join the discussion