GATE 2026 set1 Civil Engineering question: The intensity-duration relationship for a rainfall on a rectangular plot ABCD of area 7…
The intensity-duration relationship for a rainfall on a rectangular plot ABCD of area 7 ha (1 ha = m) can be modelled by the following equation:
where is rainfall intensity (in cm/h), and is the duration (in minutes) of rainfall. The average runoff coefficient over the area is 0.60. The time of entry (in minutes) to the outfall from the corners A, B, C, and D is 10, 20, 15 and 25, respectively.
The design flowrate (in m/h) of the storm-sewer at the outfall is _____ (in integer).
Show answer
Official answer: 300