GATE Assistant

Past questions › Mining Engineering › GATE 2026

GATE 2026 · MN · NAT · 2 marks · Surface Environment, Mine Ventilation and Underground Hazards › Air, Water & Soil Pollution

GATE 2026 Mining Engineering question: In a biochemical oxygen demand (BOD) test, 15 ml of wastewater sample was diluted with…

In a biochemical oxygen demand (BOD) test, 15 ml of wastewater sample was diluted with distilled water to completely fill a 300 ml BOD bottle and incubated at 20 °C for 5 days. The dissolved oxygen (DO) level before and after incubation are 9.2 mg liter and 4.4 mg liter, respectively. The BOD of the sample, in mg liter, is ______________. (answer in integer)

Show answer

This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.

Practise this question with exam-style marking