GATE Assistant

Past questions › Petroleum Engineering › GATE 2026

GATE 2026 · PE · NAT · 2 marks · Oil and Gas Well Testing › Superposition & Horner Approximation

GATE 2026 Petroleum Engineering question: Three wells are at the corners of an equilateral triangle inside an infinite acting…

Three wells are at the corners of an equilateral triangle inside an infinite acting reservoir. The reservoir is horizontal, homogenous and isotropic and has uniform thickness. Initial reservoir pressure is 3000 psi. If only one of the wells had been producing in the transient state, the pressure at the centre of equilateral triangle would have dropped by 100 psi after 60 days.
If all the three wells started producing simultaneously in transient state at the same rate, then after 60 days since the start of production, the pressure at the centre of the equilateral triangle (in psi) is _____________. (Answer in integer)

Show answer

This question is in an all-India live mock that is open now. Its answer appears here when the mock closes.

Practise this question with exam-style marking